A realistic timeline from a local bathroom fitter, so you know what to expect before the work starts.
Most people picture a bathroom being ripped out and back together in a weekend. In reality a proper job takes a little longer than that — but knowing the timeline up front makes it far less stressful.
As a rough guide, most new bathrooms take around 5 to 10 working days. A simple refresh in the same layout can be done in 2 to 3 days, while a big or high-spec bathroom — especially if the layout is moving — can run to two weeks or more.
Tiling in particular needs time to set properly between stages. Rushing it is how you end up with problems later, so it's worth letting it breathe.
Because Dec takes on the whole bathroom fit himself — plumbing, tiling and finishing — there's no waiting around for different trades to turn up. He gives you a realistic timeline before he starts, tells you which days the room will be off-limits, and keeps the place as tidy as he can while he works. If anything unexpected crops up behind the walls, he'll talk it through with you rather than spring a surprise.
Call or text Dec on 07493 772609, or send a few details and he’ll get back to you.